Wind farm construction and heavy lifting

Civil, electrical and lifting works for wind farms — and planned crane lifts for heavy components on industrial and infrastructure sites.

Lattice crawler crane lifting a wind turbine blade beside a turbine tower

Overview

What do we deliver on wind farm projects?

Wind farms depend on solid roads, precise foundations and safe lifts. Elite Green builds compacted access roads and hardstands for turbine deliveries and cranes, excavates and pours turbine foundations around anchor cages, supports tower, nacelle and rotor erection under approved lift plans, and trenches collector cables to the substation.

Scope of work

Wind and lifting works

Balance-of-plant civil works plus planned heavy lifts.

  1. 01

    Access roads and crane pads

    Compacted roads and hardstands for turbine deliveries and cranes.

  2. 02

    Turbine foundations

    Excavation, anchor cages, reinforcement and mass concrete pours.

  3. 03

    Tower and rotor erection support

    Crane lifts of tower sections, nacelles and rotors under lift plans.

  4. 04

    Cabling and substation works

    Collector cable trenching and substation civil works.

  5. 05

    Cranes, lifting and equipment

    Planned crane lifts and equipment support for steel, vessels and heavy components.

  6. 06

    Tandem lifts and heavy transport

    Tandem lifts under approved lift plans; transport and positioning of heavy items.

How we work

Interact, RFQ, bid, negotiate, award

A transparent procurement path from the first conversation to mobilisation.

  1. Interact

    We meet your team, understand the scope, site conditions and schedule.

  2. RFQ

    You share the request for quotation, drawings and specifications.

  3. Bid

    We submit a detailed technical and commercial proposal with a clear method statement.

  4. Negotiation

    We align on scope, price, resources and timeline — transparently.

  5. Award

    Contract signed, crews and equipment mobilised, work starts safely.

Certified systems

ISO-certified quality, safety and environment

ISO 9001Quality management

Right first time, on every site: inspection and test plans, controlled drawings and internal audits.

ISO 45001Occupational health & safety

Everyone goes home safe: risk assessments, permits to work and daily toolbox talks.

ISO 14001Environmental management

Protecting the ground we build on: dust, noise, waste and spill controls on every project.

CRCommercial registration

Registered with the Ministry of Commerce, CR No. 7055392158.

Questions

Wind and heavy lifting FAQ

What wind farm works does Elite Green deliver?

Access roads and crane pads, turbine foundations, tower and rotor erection support, and collector cable trenching and substation civil works.

How are heavy lifts planned?

Every critical lift follows an approved lift plan with competent riggers and operators, a permit to work and a pre-lift toolbox talk under our ISO 45001 system.

Do you provide heavy lifting outside wind projects?

Yes. We plan and carry out crane lifts of beams, vessels, steel and heavy components on industrial and infrastructure sites, including tandem lifts.

Can you transport and position heavy items?

Yes. We coordinate transport and positioning of heavy items as part of the lifting scope.

Last reviewed

Request for quotation

Planning a wind project or a heavy lift?

Send us your scope, drawings and schedule. We review every RFQ and respond with a clear technical and commercial proposal.

Request for quotation

Request a quote

Share your details and scope. Submitting opens your email app with the request ready to send to [email protected].