
Wind farm construction and heavy lifting
Civil, electrical and lifting works for wind farms — and planned crane lifts for heavy components on industrial and infrastructure sites.

Overview
What do we deliver on wind farm projects?
Wind farms depend on solid roads, precise foundations and safe lifts. Elite Green builds compacted access roads and hardstands for turbine deliveries and cranes, excavates and pours turbine foundations around anchor cages, supports tower, nacelle and rotor erection under approved lift plans, and trenches collector cables to the substation.
Scope of work
Wind and lifting works
Balance-of-plant civil works plus planned heavy lifts.
- 01
Access roads and crane pads
Compacted roads and hardstands for turbine deliveries and cranes.
- 02
Turbine foundations
Excavation, anchor cages, reinforcement and mass concrete pours.
- 03
Tower and rotor erection support
Crane lifts of tower sections, nacelles and rotors under lift plans.
- 04
Cabling and substation works
Collector cable trenching and substation civil works.
- 05
Cranes, lifting and equipment
Planned crane lifts and equipment support for steel, vessels and heavy components.
- 06
Tandem lifts and heavy transport
Tandem lifts under approved lift plans; transport and positioning of heavy items.
How we work
Interact, RFQ, bid, negotiate, award
A transparent procurement path from the first conversation to mobilisation.
Interact
We meet your team, understand the scope, site conditions and schedule.
RFQ
You share the request for quotation, drawings and specifications.
Bid
We submit a detailed technical and commercial proposal with a clear method statement.
Negotiation
We align on scope, price, resources and timeline — transparently.
Award
Contract signed, crews and equipment mobilised, work starts safely.
Certified systems
ISO-certified quality, safety and environment
- ISO 9001Quality management
Right first time, on every site: inspection and test plans, controlled drawings and internal audits.
- ISO 45001Occupational health & safety
Everyone goes home safe: risk assessments, permits to work and daily toolbox talks.
- ISO 14001Environmental management
Protecting the ground we build on: dust, noise, waste and spill controls on every project.
- CRCommercial registration
Registered with the Ministry of Commerce, CR No. 7055392158.
Questions
Wind and heavy lifting FAQ
What wind farm works does Elite Green deliver?
Access roads and crane pads, turbine foundations, tower and rotor erection support, and collector cable trenching and substation civil works.
How are heavy lifts planned?
Every critical lift follows an approved lift plan with competent riggers and operators, a permit to work and a pre-lift toolbox talk under our ISO 45001 system.
Do you provide heavy lifting outside wind projects?
Yes. We plan and carry out crane lifts of beams, vessels, steel and heavy components on industrial and infrastructure sites, including tandem lifts.
Can you transport and position heavy items?
Yes. We coordinate transport and positioning of heavy items as part of the lifting scope.
Last reviewed

Request for quotation
Planning a wind project or a heavy lift?
Send us your scope, drawings and schedule. We review every RFQ and respond with a clear technical and commercial proposal.


